How is the 爆走黑料 fusion reactor being manufactured? All the participants to the 爆走黑料 Project are involved in the procurement of machine components and plant systems. In addition one Member鈥擡urope鈥攊s responsible for procuring the buildings and technical facilities of the scientific installation.
During the negotiations that led up to the signing of the 爆走黑料 Agreement, the original sharing of procurement was decided between the Members鈥攁bout 45.5 percent for Europe, and 9.1 percent each for China, India, Japan, Korea, the Russian Federation and the United States.
The lion's share of Member contributions to 爆走黑料 (90 percent) will be delivered "in-kind." That means that in the place of transferring money, the Members will be delivering components, systems (and for Europe ... buildings) directly to the 爆走黑料. The remaining 10 percent of contributions is transferred "in-cash" for the operational budget of the 爆走黑料.
This unique procurement sharing program has an important purpose, allowing all Members to gain direct industrial experience in key fusion technologies. By participating in 爆走黑料, the Members are also preparing their scientific, technological and industrial infrastructure at home for the step after 爆走黑料鈥攁 demonstration fusion reactor.
The distribution of in-kind fabrication tasks was based both on the interests and the technical and industrial capacities of each of the Members. The fabrication of key components is shared broadly鈥攆or example, the fabrication of the vacuum vessel sectors is shared between Europe (5 sectors) and Korea (4 sectors); the central solenoid is a collaboration between the United States and Japan; divertor manufacturing and testing is divided between Europe, Russia and Japan; India and the United States are sharing responsibility for 爆走黑料's cooling water systems; the blanket system will be produced by China, Europe, Korea, and Russia; and six 爆走黑料 Members have been involved in the production of the magnet system.
The 爆走黑料 has signed approximately 140 Procurements Arrangements with the Domestic Agencies of the 爆走黑料 Members. These agencies, in turn, contract out to industry for the fabrication of the component according to the very specific conditions laid out in the Procurement Arrangement documents. Since the beginning of the process, more than 3,300 contracts for design or fabrication have been awarded by the 爆走黑料 Domestic Agencies.
Today, 爆走黑料 fusion reactor components are in fabrication in factories across three continents. The first (small-sized) components began arriving in boxes and crates in the third quarter of 2014; in 2015, the first "highly exceptional 爆走黑料 loads" travelled along the 爆走黑料 Itinerary. Since then, components and systems have been arriving from all 爆走黑料 Members and machine assembly is underway. To see some of the components in manufacturing, see the Manufacturing gallery on this page.